Tullow Begins Multi-Well Drilling Campaign in Ghana

Tullow Oil plc (Tullow) is pleased to announce the start of a multi-year, multi-well drilling campaign offshore Ghana with the commencement of drilling of the first well at the Jubilee Field yesterday.
As previously announced, the Maersk Venturer, which has been contracted for four years, is expected to drill four wells in total in 2021, consisting of two Jubilee production wells, one Jubilee water injector well and one TEN gas injector well.
The 2021 drilling campaign is the first part of Tullow’s 10-year Business Plan which was presented at Tullow’s Capital Markets Day in November 2020. The Ghana portfolio has a large resource base with extensive infrastructure already in place. Through a rigorous focus on costs and capital discipline, Tullow believes that these assets have the potential to generate material cash flow over the next decade and deliver significant value for Ghana and investors.
Click on the link below for full report
Source: PetroleumAfrica